Free Exam Questions Download

All the resources to help you pass the exam!
Subscribe

Archive for the ‘CCNP’

CCNP 642-832 EXAM 5

January 20, 2012 By: admin Category: CCNP

QUESTION 41

Following ticket consists of a problem description and existing configuration on the device.

TROUBLE TICKET STATEMENT:

The implementation group has been using the test bed to do a ‘proof-of-concept’ that required both client 1

and client 2 to access the Web Server at 209.65.200.241. After several changed to interface status,

network addressing, routing schemes and layer 2 connectivity, at trouble ticket has been opened indicating

that client 1 cannot ping the 209.65.200.241 (internet Server).

show run

(more…)

Tags: ,

CCNP 642-832 EXAM 4

January 20, 2012 By: admin Category: CCNP

QUESTION 30

Following ticket consists of a problem description and existing configuration on the device.

TROUBLE TICKET STATEMENT:

The implementation group has been using the test bed to do a ‘proof-of-concept’ that required both client 1

and client 2 to access the Web Server at 209.65.200.241. After several changed to interface status,

network addressing, routing schemes and layer 2 connectivity, at trouble ticket has been opened indicating

that client 1 cannot ping the 209.65.200.241 (internet Server).

show run

(more…)

Tags: ,

CCNP 642-832 EXAM 3

January 20, 2012 By: admin Category: CCNP

QUESTION 21

Following ticket consists of a problem description and existing configuration on the device.

TROUBLE TICKET STATEMENT:

“The implementation group has been using the test bed to do a ‘proof-of-concept’ that required both client 1

and client 2 to access the Web Server at 209.65.200.241. After several changed to interface status,

network addressing, routing schemes and layer 2 connectivity, at trouble ticket has been opened indicating

that client 1 cannot ping the 209.65.200.241 (internet Server)”

show run

(more…)

Tags: ,

CCNP 642-832 EXAM 2

January 18, 2012 By: admin Category: CCNP

QUESTION 11
Which three management categories are contained in the FCAPS network maintenance model?(choose
three)
A. accounting
B. telecommunications
C. config
D. fault
E. storage
F. redundancy
Answer: ACD
Explanation/Reference:
QUESTION 12
A technician is troubleshooting connectivity prolems between two routers are directly connected through a serial line.The show cdp interface command shows that serial line is up and CDP has been enable. the technician cannot see any neighbors in the output of the show cdp neibors command.In which OSI layer is the problem most likely occur?

(more…)

Tags: ,

CCNP 642-832 EXAM1

January 17, 2012 By: admin Category: CCNP

QUESTION 1
FCAPS is a network maintenance model defined by ISO. What does it stand for?
A. Action Management
B. Fault Management
C. Configuration Management
D. Protocol Management
E. Security Management
Answer: BCE
Explanation/Reference:
QUESTION 2
Which alerts will be seen on the console when running the command: logging console warnings.
A. warnings only
B. warnings, notifications, error, debugging, informational
C. warnings, errors, critical, alerts, emergencies
D. notifications, warnings, errors
E. warnings, errors, critical, alerts
Answer: C
Explanation/Reference:
QUESTION 3
You have 2 commands used for ftp:
ip ftp username xxxxxx
ip ftp password yyyyyy
Which two commands will be used when switching from ftp to http?
A. ip http username xxxxxx
B. ip http client username xxxxxx
C. ip http password yyyyyy
D. ip http client password 0 yyyyyy
E. ip http server username xxxxxx
F. ip http server password yyyyyy
Answer: BD
Explanation/Reference:
QUESTION 4
Which two of the following options are categories of Network Maintenance tasks?
A. Firefighting
B. Interrupt-driven
C. Policy-based
D. Structured
E. Foundational

(more…)

Tags: ,

HSRP Hotspot

January 05, 2012 By: admin Category: CCNP

switch

HSRP Hotspot

Question 1:
1

During routine maintenance, it became necessary to shutdown G1/0/1 on DSW1. All other interface were up. During this

(more…)

Tags: ,

CCNP introduction

December 11, 2011 By: admin Category: CCNP

CCNP full name is: Cisco Certified Network Professional – Cisco Certified Networkengineer. NA valid for three years, wanted to test the NP within three years, finished thechildren’s shoes need a NP, the longest interval of three years each door, needsfinished the longest nine years. Test an NP, NA extended for three years, so shoesexpired NA fast re-authentication or exam can choose a NP. CCNP routing, includingthree,642-902,642-813,642-832 troubleshooting exchange. Cisco exam questions are randomly selected, CCNP CCNA exam with the same kinds of questions, out of 1,000points, passing score is 790 points, the number of questions about the following, we want to pro forma NP and children’s shoes are helpful:
642-902 Routing Exam: test of 50 questions about 52 general test questions, testand got four, drag map and got one to five or so, and the rest are multiple-choice questions.
642-813 switching exam: test of 50 questions about 52 general test questions, testand got three, drag map and got one to five or so, and the rest are multiple-choice questions. Exam wireless and voice behind the basic need to see, not test, test to testis only twelve.
Troubleshooting 642-832 exam: test 13TT, multiple choice, drag map test twelvequestions were a total of generally not more than five. Multiple-choice questions, dragfigure caption on nothing to say, we just like to remember the correct option, drag all the words to remember figure caption, the examination may order changes.
642-902 exam route to the four test questions:
1.EIGRP OSPF Redistribution Sim
2.Policy Based Routing Sim
3.IPv6 OSPFVirtual Link Sim
4.OSPF Sim
642-813 exam exchange experiment to three questions:
AAA
MLS and EIGRP sim
LACP with STP
642-832 exam Troubleshooting 14TT 13TT Ticket 10 – EIGRPAS not test, 13 TTquestions, every question is 3, 3 to ask about are: The first question is that theequipment error, and second question is what’s wrong The third question is how to fix it. TT questions are multiple choice, back back on it.